Our Services

Solutions we offer
ODM (full solution)
Custom look, features, capacity from scratch — perfect for unique products.
OEM (private label)
Pick existing molds, rebrand & repack fast — ideal for value & speed.
Custom gifts
Logo printing, pattern custom, gift box set.
Cooperation flow
Needs communication
Target market, capacity, interface, appearance, budget, certification requirements, etc.
Solution design
ID design / structural design / PCB solution / cell selection, etc.
Sample production
Rapid prototyping, functional & reliability tests.
Confirmation & sealing
Client confirms look, print, pack, functions.
Mass production
MES integration, full-process auto/semi-auto QC.
Quality inspection
Key equipment: full & sample inspection, traceability report.
Logistics delivery
Sea/air/courier shipping, customs docs included.
After-sales support
Complaint response, defect analysis, continuous improvement.
Product categories

Built-in cable power bank

Magnetic fast-charge bank

High-power fast-charge bank

Other power bank models
Product catalog

Scan for product manual
Access product model, image, and parameter information immediately.
Frequently Asked Questions (FAQs)
MOQ 3K typical, varies by model.
The production lead time with material preparation is 35 days. Without material preparation: shipment starts 14 days after all materials are ready.
The products hold international certifications such as UL, CE, FCC, RoHS, UN38.3, MSDS, etc. For different markets, we can also provide: UL for the US, CE for the EU, PSE for Japan, KC for Korea, CCC for China, etc. Additionally, we have global product liability insurance.
The prototyping cycle is typically 5–7 days, counting from the confirmation of the design renderings, and may vary depending on project complexity. The sample fee is usually deductible from the payment after the mass production order is confirmed.
Yes, we provide comprehensive technical support and after-sales services, including product usage guidance, technical consultation, and after-sales issue resolution.
The certification timeline varies by country and region. It can be as quick as 3–4 weeks or as long as 2–3 months, depending on the certification type, test items, and lab scheduling. The process can start in parallel with the project kick-off.
